Coming Soon...
Environmental Protection Geosynthetics
2025-02-10T12:00:38+00:00Environmental Protection Geosynthetics TechRevetment TerraGreen TechCanvas TerraDyke
Temporary and Final covers
2025-02-07T04:04:46+00:00The construction of temporary covers allows the operator to limit the infiltration of rainwater into the waste mass (and thus the production of leachate) and also to collect the Landfill Gas (LFG) and limit odor problems while waiting for the construction of the final cover.
Leak detection with conductive geosynthetics
2025-02-07T04:03:40+00:00To protect the groundwater from leachate infiltration, the construction or extension of Municipal solid waste and Industrial waste landfills incorporates single or double liner systems.
Leachate collection
2025-02-06T11:37:34+00:00As part of the Leachate Collection and Removal System (LCRS), the leachate collection layer at the bottom of the cell limits the hydraulic head level over the primary or secondary geomembranes.
Tunnel and Underground Protection
2025-02-06T04:08:28+00:00Extrados drainage of underground structures such as cut and cover tunnels, limits the hydraulic head on the structure and prevents water infiltration.
Drainage of heap leach pads channel/ditch lining
2025-02-06T11:36:39+00:00When draining leachates as part of metal extraction operations in leach pads, DRAINTUBE® provides a suitable solution for a full and timely collection as well as the disposal of metal-rich solutions.
Mine waste deposit final closure
2025-02-06T04:11:10+00:00After operation, the tailings storage areas are covered by a final impermeable cover system.
Tailings dam drainage
2025-02-06T04:09:41+00:00Internal drainage is of vital importance to the safety and reliability of tailings dams.